60
112" x 60" Supply and exhaust duct runs per M-301 do not fit within space provided between overhead steel framing of screen wall and roof structure per S-301 as shown on A-302.
A-102A
2
Discipline Coordination
20
Four Seasons Private Residences
Henderson, NV
Arch
STRUC
Mech


15
Building Sector C has (2) egress paths and both lead to horizontal exits which are not compliant with IBC 1026.1. Provide a compliant second means of egress (exit stair) from all sector C levels.
A-101B
3
Building Code
70
UU HMH Translational Research Building
Salt Lake City, UT
Arch
STRUC
Interior


75
The seismic joint crossing the firewall will compromise the integrity of the required 3-HR fire rating along the entire height of the building. Confirm design intent and relocate the seismic joint to avoid rated assemblies.
A-101C
2
Constructability
50
Ridge Walk North Living & Learning Neighborhood
La Jolla, CA
Arch
STRUC


40
6" POC Sanitary Sewer pipe size & location from Parking Structure per 1CU201 Civil Sewer Plan & 1CU102 Civil Utility Plan does not match 4" per 4.PL100 Underground Garage Plumbing Plan.
1.AS101
2
Discipline Coordination
75
99 Monitor Street
Jersey City, NJ
Arch
Civil
Plumb


40
The number of private parking spaces does not comply with CBC Table 11B-208.2, which requires one accessible parking space. CBC 11B-208.2 specifies that if multiple parking facilities exist on site, the required accessible spaces must be calculated for each facility individually.
A-101C
3
Accessibility (ADA)
75
Torrey Pines Fire Station 52
La Jolla, CA
Arch
Civil
Land